Installing The Air-Duct Option - Lenovo G7028 Installation Manual

Hide thumbs Also See for G7028:
Table of Contents

Advertisement

Installing the Air-Duct Option

© Copyright Lenovo 2015
The G7028 supports an optional 1U air duct to maximize air flow conditions in a 19"
rack.
For information on removing an installed 1U air-duct option, see
Air-Duct Option" on page
The following table lists the parts included with the air-duct option kit.
Table 10. Air-duct Option Kit parts
Item Number Description
Cable tie
1
1U Duct sleeve (long)
2
Mounting bracket (left)
3
Mounting bracket (right)
4
Foam carrier assembly
5
M3.5 screws
6
Attention: The rack-mounting frame may not be able to support the weight of the
networking switch with only the front post mounting brackets (2-post application). If
the switch has an undesirable amount of sag, it is recommended to use a 4-post
mounting kit.
Attention: For earthquake stability, mount the switch in a 4-post rack.
65.
6
5
Chapter 3: Installing G7028 Hardware and Options
"Removing the
1
Quantity
4
1
1
1
2
6
47